Cover will be removed and stored on customer's property as needed.
Pump, heater, filter, and other equipment will be made operational.
Ladders and rails will be installed. If they wobble or the anchor is damaged, they will be left out.
3 pounds of chlorine shock will be added with no extra charge.
The pool will be given an initial skimming and vacuuming to remove most of the debris accumulated over the winter. This is NOT intended to completely clear your pool of all debris. If debris such as rocks are found in the bottom of the pool, we will not vacuum to avoid damaging our equipment and your pool.
Automatic cleaner will be assembled.
Pressure gauges, return fittings, skimmer baskets, and plugs will be installed as needed.
Pool will be brushed.
Cover anchors will be lowered or removed as needed.
Pool deck will be blown free of leaves.
Important Note
We require that the water level of the pool be halfway up the skimmer in order to open your pool without damage to your equipment. Please make sure the water level is high enough before we arrive. If we cannot open the pool due to insufficient water level, a $50 rescheduling fee will be assessed. Water should be removed off of a solid cover before our arrival. Additional chemicals may be needed and are not included in our pricing. Additional labor rates may apply.